Barrymore Road Pavilion - half way mark
In the three weeks since our last post, more blockwork has been completed including part of the patterned external walls. These are quite tricky because the design requires two different coloured blocks laid to a pattern that includes slotted windows and glazed bricks. The electrical wiring and mechanical ductwork has also been roughed in, as has the plumbing.